Key Takeaways

  • Gantry shears provide 800-2000T cutting force vs container shears' 400-800T for heavy materials
  • Container shears offer complete mobility while gantry shears excel at permanent installations
  • Gantry shears process 150-220 tons/hour vs container shears' 15-45 tons/hour capacity
  • Setup time: 30 minutes for container vs 2-4 weeks for gantry shear installation
  • Material thickness capability: Gantry shears handle up to 300mm vs container shears' 150mm

When processing heavy scrap metal, choosing between a gantry shear and container shear is a critical decision that impacts your operation's efficiency, costs, and material handling capabilities. Each technology serves distinct purposes in heavy scrap processing, with significant differences in cutting force, mobility, and application suitability.

Understanding Heavy-Duty Shear Technologies

Gantry Shears

Gantry shears are large, stationary hydraulic cutting machines designed specifically for processing thick steel plates, heavy structural materials, and industrial-grade scrap. They feature massive cutting forces up to 2000 tons and can handle materials up to 300mm thickness.

  • • 800-2000T cutting force capability
  • • Handles up to 300mm steel thickness
  • • 150-220 tons/hour processing capacity
  • • Permanent installation required
  • • Ideal for steel mills and shipyards

Container Shears

Container shears are mobile hydraulic cutting systems housed in shipping containers for complete portability. They offer 400-800 tons cutting force and excel in multi-site operations where mobility and rapid deployment are essential.

  • • 400-800T cutting force
  • • Handles up to 150mm steel thickness
  • • 15-45 tons/hour processing capacity
  • • Complete containerized mobility
  • • 30-minute setup capability

Detailed Comparison Matrix

AspectGantry ShearContainer ShearAdvantage
Cutting Force800-2000 tons400-800 tonsGantry
Maximum Thickness300mm steel plate150mm steel plateGantry
Processing Capacity150-220 tons/hour15-45 tons/hourGantry
MobilityFixed installationFull containerized transportContainer
Setup Time2-4 weeks installation30 minutesContainer
Multi-Site OperationSingle location onlyFlexible multi-site useContainer
Foundation RequirementsHeavy concrete foundationMinimal/temporaryContainer
Heavy Material HandlingExcellent for thick steelGood for standard materialsGantry
Initial Investment$450,000-$1,200,000$280,000-$650,000Container
Total Installation Cost$500,000-$1,350,000$285,000-$665,000Container

Heavy Scrap Application Analysis

Different heavy scrap processing scenarios require specific shear technologies based on material characteristics, volume requirements, and operational constraints:

Steel Mills & Smelting Plants

Recommended: Gantry Shear

Typical Materials:

Mill scale, heavy returns, thick steel sections

  • Process heavy mill scale and thick steel returns efficiently
  • Handle production waste up to 300mm thickness
  • Continuous high-volume operation capability
  • Maximum cutting force for heavy industrial materials

Shipyards & Marine Dismantling

Recommended: Gantry Shear

Typical Materials:

Ship hulls, maritime structures, heavy marine steel

  • Cut heavy maritime steel structures and ship hulls
  • Process large marine components efficiently
  • Handle thick ship hull sections requiring maximum force
  • Permanent installation for continuous shipbreaking

Mobile Scrap Operations

Recommended: Container Shear

Typical Materials:

Mixed ferrous scrap, structural steel, auto bodies

  • Rapid deployment to different collection sites
  • Process scrap at source to reduce transport costs
  • Flexible operations without permanent infrastructure
  • Quick setup for temporary or emergency projects

Construction & Demolition Sites

Recommended: Depends on Project Scale

Typical Materials:

Building steel, demolition debris, structural components

  • Container shear for temporary/small projects
  • Gantry shear for major demolition operations
  • Consider material thickness and volume
  • Evaluate project duration and infrastructure

Heavy Material Processing Capability

Thick Steel Plates (200-300mm)

Gantry Shear:

Excellent - designed for maximum thickness cutting

Container Shear:

Limited - typically handles up to 150mm effectively

Recommendation:

Gantry shear required for materials over 200mm thickness

Ship Hull Sections

Gantry Shear:

Excellent - handles heavy maritime steel structures

Container Shear:

Good - suitable for lighter vessel components

Recommendation:

Gantry preferred for major shipbreaking operations

Heavy Structural Beams

Gantry Shear:

Excellent - maximum force for large I-beams and H-beams

Container Shear:

Good - handles standard structural sizes

Recommendation:

Gantry for heavy industrial beams, container for building structures

Mill Scale & Returns

Gantry Shear:

Excellent - designed for steel mill heavy waste

Container Shear:

Limited - insufficient force for thick mill materials

Recommendation:

Gantry shear essential for steel mill applications

Mixed Heavy Scrap

Gantry Shear:

Excellent - versatile handling of varied heavy materials

Container Shear:

Good - adequate for standard mixed scrap

Recommendation:

Choose based on material thickness and processing volume

Cost & ROI Analysis

Understanding the total cost of ownership is crucial for heavy scrap processing equipment selection:

Cost FactorGantry ShearContainer ShearNotes
Equipment Purchase$450K-$1,200K$280K-$650KGantry shears cost 60-85% more due to higher cutting force capability
Foundation & Installation$50K-$150K$5K-$15KGantry requires substantial concrete foundations and professional installation
Setup & Commissioning$15K-$50K$3K-$8KGantry installation requires 2-4 weeks vs 30 minutes for container
Annual Operating Costs$45K-$85K$25K-$45KHigher energy consumption and maintenance for gantry systems
Relocation Costs$200K-$500K$8K-$15KGantry relocation requires complete disassembly and reinstallation

ROI Considerations:

  • Gantry Shears: Higher upfront investment but superior throughput for high-volume operations
  • Container Shears: Lower total investment with flexibility premium for multi-site operations
  • Payback Period: Gantry: 18-36 months for high-volume, Container: 12-24 months for multi-site
  • Long-term Value: Consider material requirements, volume growth, and operational flexibility

Decision Framework for Heavy Scrap Processing

Use this framework to determine which shear technology best fits your heavy scrap processing requirements:

Decision CriteriaChoose Gantry If...Choose Container If...
Material ThicknessMaterials over 150mm thicknessMaterials up to 150mm thickness
Processing Volume100+ tons/hour continuous processingUp to 45 tons/hour processing
Operation TypePermanent single-site operationMulti-site or temporary operations
Setup TimelineLong-term planning and permanent installationImmediate operation required
InfrastructureSubstantial foundation and utilities availableMinimal infrastructure or temporary setup
Budget ConstraintsMaximum performance prioritizedLower total investment preferred

Expert Recommendations

ARZIR Heavy Scrap Processing Guidelines:

  • Assess material thickness first: Materials over 200mm require gantry shear cutting force
  • Evaluate processing volume: Operations over 100 tons/hour benefit from gantry capacity
  • Consider site requirements: Multi-site operations strongly favor container mobility
  • Plan for material growth: Heavy industrial growth may require gantry capabilities
  • Hybrid approach: Large operations often use both types strategically

Quick Selection Guide:

Choose Gantry Shear When:
  • • Processing thick steel plates (200mm+)
  • • Steel mill or shipyard operations
  • • High-volume continuous processing
  • • Permanent facility with infrastructure
  • • Maximum cutting force required
Choose Container Shear When:
  • • Multi-site operations required
  • • Standard thickness materials (≤150mm)
  • • Rapid deployment needed
  • • Temporary or project-based work
  • • Lower total investment preferred

Frequently Asked Questions

Can container shears handle the same materials as gantry shears?

Container shears are excellent for most scrap materials up to 150mm thickness with 400-800T cutting force. However, gantry shears with 800-2000T force are specifically designed for thicker materials (up to 300mm) and heavier industrial scrap that container shears cannot effectively process.

Which offers better value for money - gantry or container shears?

Container shears typically offer better value for operations requiring flexibility and mobility, with 40-60% lower total costs including installation. Gantry shears provide superior value for high-volume, permanent operations processing heavy materials where their higher cutting force and capacity justify the increased investment.

How do processing speeds compare between the two technologies?

Gantry shears significantly outperform container shears in processing capacity, handling 150-220 tons/hour vs 15-45 tons/hour. This 3-5x capacity difference makes gantry shears ideal for high-volume operations, while container shears excel in flexibility and rapid deployment.

Can I upgrade from container to gantry shear as my operation grows?

Yes, many operations start with container shears for their flexibility and lower investment, then add gantry shears as volumes and material requirements increase. The container shear can be relocated or used for mobile operations while the gantry handles high-volume processing at the main facility.

Which is better for steel mill and shipyard applications?

Gantry shears are typically preferred for steel mills and shipyards due to their ability to handle thick steel plates, heavy mill scale, and massive ship hull sections. The 800-2000T cutting force and 300mm thickness capability make them essential for these heavy industrial applications.

Choose the Right Heavy Scrap Processing Solution

Get expert guidance on selecting the optimal heavy-duty cutting solution for your specific material requirements.

View Gantry Shears