Mining & Extraction Waste Processing
Heavy-duty waste processing solutions for mining industry equipment and ore processing waste. Specialized equipment for the most demanding mining applications.

Heavy-Duty Mining Equipment
Industrial-grade processing systems designed to handle the most demanding mining applications
Heavy-Duty Shredders
10-50 tons/hour
Large mining equipment and conveyor belt processing
Technical Specifications:
Key Benefits:
- Process oversized materials
- Reduce transport volume
- Recover valuable metals
Gantry Shears
500-2000 ton force
Structural steel and heavy mining machinery cutting
Technical Specifications:
Key Benefits:
- Cut massive structural components
- On-site processing
- Safety focused design
Ore Waste Balers
20-100 tons/hour
Compacting metal-bearing waste materials
Technical Specifications:
Key Benefits:
- Increase material density
- Improve transport efficiency
- Reduce processing costs
Sorting & Separation Systems
5-30 tons/hour
Metal recovery from mining waste streams
Technical Specifications:
Key Benefits:
- Maximize metal recovery
- Reduce waste disposal
- Improve material purity
Mining Waste Categories
Comprehensive solutions for all types of mining and extraction waste materials
Structural Mining Equipment
Typical Materials:
Processing Challenges:
- Massive size
- High strength materials
- Complex geometries
- Remote locations
ARZIR Solutions:
- Mobile processing units
- On-site cutting and shredding
- Modular equipment design
Ore Processing Waste
Typical Materials:
Processing Challenges:
- Mixed material streams
- Contamination
- Environmental concerns
- Volume management
ARZIR Solutions:
- Advanced sorting systems
- Density separation
- Chemical treatment integration
Infrastructure Materials
Typical Materials:
Processing Challenges:
- Geographic dispersion
- Weather exposure
- Access difficulties
- Mixed materials
ARZIR Solutions:
- Mobile processing equipment
- Weather-resistant systems
- Modular deployment
Vehicle & Machinery Scrap
Typical Materials:
Processing Challenges:
- Fluid contamination
- Size constraints
- Component complexity
- Value recovery
ARZIR Solutions:
- Fluid drainage systems
- Component separation
- Specialized dismantling
Complete Processing Solutions
End-to-end waste processing from assessment to material recovery
Assessment & Planning
Comprehensive site evaluation and processing strategy development
Key Activities:
- Waste stream analysis and characterization
- Site accessibility and logistics evaluation
- Equipment sizing and capacity planning
- Environmental impact assessment
Equipment Deployment
Mobile or permanent equipment installation based on site requirements
Key Activities:
- Equipment transportation and setup
- Utility connections and commissioning
- Safety system implementation
- Operator training and certification
Processing Operations
Continuous waste processing with quality control and monitoring
Key Activities:
- 24/7 processing operations
- Real-time quality monitoring
- Material sorting and recovery
- Environmental compliance tracking
Material Recovery
Value extraction and preparation for downstream processing
Key Activities:
- Metal separation and purification
- Material grading and certification
- Transport logistics coordination
- Revenue optimization strategies
Mining Industry Success Stories
Proven results from major mining operations worldwide
Copper Mine Waste Processing Facility
Challenge:
Processing 200 tons/day of mixed mining equipment waste
Solution:
Integrated mobile processing system with gantry shears and heavy-duty shredders
Equipment Configuration:
ARZIR Mobile Processing System + Gantry Shears
Project Results:
- Processed 72,000 tons annually of mining waste
- Achieved 85% metal recovery rate
- Reduced waste disposal costs by 70%
- Generated $2.4M in recovered material value
Iron Ore Infrastructure Recycling
Challenge:
Decommissioning aging conveyor systems and processing equipment
Solution:
On-site cutting and processing with mobile shredding units
Equipment Configuration:
ARZIR Mobile Shredding Units + Sorting Systems
Project Results:
- Processed 150 km of conveyor systems
- Recovered 15,000 tons of structural steel
- Achieved 90% material recovery rate
- Completed project 30% faster than planned
Sustainable Mining Practices
Supporting responsible mining through efficient waste processing and resource recovery
Resource Recovery
Maximize valuable metal recovery from mining waste streams
Key Metrics:
Impact: Reduce dependency on virgin material extraction
Environmental Remediation
Clean up mining sites and reduce environmental impact
Key Metrics:
Impact: Restore mining areas to productive use
Circular Economy
Transform mining waste into valuable input materials
Key Metrics:
Impact: Support sustainable mining practices
Economic Value
Generate revenue from previously disposed waste materials
Key Metrics:
Impact: Improve mining operation profitability
Ready to Optimize Your Mining Waste Processing?
Get expert consultation and custom quotes for mining industry waste processing solutions tailored to your operational requirements.
Get Mining Quote
Start your recycling equipment journey with ARZIR
By submitting this form, you agree to our privacy policy.